Description
The Electrical Distribution Systems Design and Release (D\&R) Engineer is responsible for the design, development, validation, and release of the wiring harnesses under their responsibility. The EDS D\&R is also responsible for design improvements that lead to quality increase, cost and weight optimizations.
* Engineering Degree (Mechanical, Electrical, Mechatronics desired).
* Strong English Proficiency (written, read, and oral).
* Basic 3D CAD Knowledge (TeamCenter, Vismockup))
* Microsoft Office Usage (Excel, Word, PowerPoint, and Visio).
* Time and Project Management.
* Ford GPDS.
* Understanding of feature partitioning.
* Understanding of automotive systems.
* Design wiring harnesses complying with program cost, weight, quality, performance, and timing targets.
* Complies with Robustness Engineering Disciplines (Quality history, P\-Diagram, FMEA, etc.) ensuring compliance to requirements and specifications.
* Knowledge and application of six sigma and 8D
* 4 days on site in GTBC FORD MÉXICO (NAUCALPAN)
* Leads Technical Design Reviews (TDRs)
* Release parts in FEDEBOM and WERS through the product life cycle. Support the Change Control Meeting.
* Audit and update BOM (Bill of Material) with correct part levels and usage, for prototype builds and maintain it post Job 1\.
* Identify validation, durability and functional test required as per requirements and specifications. (DVP / FEDE DVP dashboard)
* Issue resolution in Digital and Build Phases of Product Development.
* Analyze and breakdown Program Direction Letter and Trim Spiders to account for EDS.
* Generate proposals to minimize giveaway cost and reduce total part count.
* Generate design optimization proposals utilizing benchmarking.
* Develop and maintain the build level complexity charts.
* Perform Harness Complexity Analysis.
* Perform engineering cost estimates.
* Define and verify engineering prototypes requirements at part level.
* Parts implementation/Sign\-off in manufacturing and assembly plants assisting quality issue resolution in all milestones.
* Support prototype and production build events for forward model programs.
* Support quality and manufacturing quality forums s required.
* Complies with GPDS deliverables (applicable to EDS) for each milestone.
* Submit invention disclosures, process improvements and best practices.
* Comply with training as outlined in calendar year objectives.